: This project consists of providing equipment, and labor for the installation of fourteen (14) new steel transmission structures, including the installation of the new 115KV conductors, providing all necessary attachments including the reattachment of the existing distribution (under build), as well as the removal and / or modification of the existing wood poles as indicated in the plan drawings and specifications. Terrebonne Parish Consolidated Government will provide all required materials to complete this project and will work with the contractor to procure any incidental material needed during construction. The contractor should be providing all necessary equipment. However, it should be clear that the contractor is responsible for re-coating the transmission poles which includes preparation of the surface.