1. PCC-SIDEWALK IN PLACE 6,000-10,000 SQUARE FOOT 10,000 X Unit Cost 2.A. PCC-SIDEWALK IN PLACE WITH CURB-ADA 3,000-5,000 SQUARE FOOT 5,000 X Unit Cost 2.B. PCC- CURB-ADA 2,000-4,000 LINEAL FOOT 4,000 X Unit Cost 3.A. PCC-DRIVE WAY APRON 2,000-10,500 SQUARE FOOT 10,500 X Unit Cost 3.B. PCC-DRIVE WAY APRON WITH FIBER MESH 2,000-15,500 SQUARE FOOT 15,500 X Unit Cost 4. PCC CURB AND GUTTER – WITH CONCRETE GROUT (CLSM) 21,000-27,500 LINEAL FOOT 27,500 X Unit Cost 5. DRIVEWAY CONCRETE WITH WIRE MESH OR FIBER MESH CONCRETE MIX TO BE DETERMINED SQUARE FOOT 1 X Unit Cost 6. CONCRETE SEALER – APRON TO BE DETERMINED SQUARE FOOT 1 X Unit Cost 7. CONCRETE SEALER – DRIVEWAY TO BE DETERMINED SQUARE FOOT 1 X Unit Cost 8. HIGH EARLY CEMENT 7-BAG MIX TO BE DETERMINED CUBIC YARD 1 X Unit Cost