The Contractor will demolish structures and facilities and/or clear, fill, and grade lots at referred work sites. As developed below, and in the indicated sequence, the contractor will verify referrals, assess referred site structures and facilities for structural soundness and the presence of materials requiring special removal or otherwise not suited for landfill disposal. The Contractor will prepare the structure for demolition and recover salvage items and materials. The Contractor will demolish the structures and facilities, clear and grade the site, and remove and dispose of all debris. When required by law or regulation, the Contractor will complete a full abatement according to the current National Emission Standards for Asbestos (NESHAP) regulation(s).