The work to be completed hereunder includes the furnishings of all supervision, labor, materials, machinery, tools, supplies, equipment, services, and appurtenances, including all utilities and transportation necessary for the complete and satisfactory abatement of all the asbestoscontaining materials that has been identified in the hazardous materials report and may be located in and/or on the Structures. All asbestos-containing waste materials which may be discovered during the subsequent demolition of the Structures will be addressed as a change order after being verified by a County representative. The Contractor shall, during the course of the abatement of the asbestos-containing materials described in the Asbestos Project Design, remove, segregate, and dispose of all asbestoscontaining waste materials. The Contractor shall take all appropriate precautions to protect all property (streets, sidewalks, utilities, utility meters, mains, etc.) from damage by the Contractor’s employees and/or the contractors equipment. The Contractor is to move any necessary debris located within the structure to another location within the structure. All identified asbestos-containing materials and/or asbestos-containing waste materials abated and removed from the project area shall be properly bagged and labeled by the Contractor prior to being transported by the Contractor or the Contractor’s agent or subcontractor to a properly licensed landfill.