A. All structures listed shall be thoroughly saturated with water during the demolition process to control dust. B. The vendor shall be responsible for preparation and filing of all waste manifest forms. C. The vendor shall be responsible for notification to the Arkansas One-Call System for utility location and removal. D. The vendor shall be responsible for providing water for saturating structures and all associated fees. E. On completion, all lots must be properly level and graded, and all debris and overgrowth shall be removed from premises. Adjacent alleys and/or right of ways must be included in the area requiring overgrowth removal. F. All approved structure(s) located onsite shall be included in the demolition. G. The vendor shall be responsible for all dumping fees. H. Copies of all dumping receipts for each structure, from an approved landfill, must be furnished to the city department by the vendor upon completion of contract. I. The vendor shall use a licensed landfill and authorized to accept asbestos containing material and other associated environmental waste. Please see attached environmental report. J. The vendor shall obtain and provide proof of the Demolition Permit for each structure.