2.01 1 L.S. SITE PREPARATION (INCLUDES MOBILIZATION) $_______ $ per Lump Sump (Unit Price in Words) 3.01 394 C.Y. UNCLASSIFIED EXCAVATION $________ $___________ ______________________ per Cubic Yard (Unit Price in Words) 3.02 185 C.Y. COMPACTED EMBANKMENT $________ $___________ ______________________ per Cubic Yard 7.06 7407 S.F. CONCRETE DRIVEWAY (6" THICK), STANDARD FINISH $________ $___________ ______________________ per Square Feet 9.04 11025 S.F. CONCRETE SIDEWALK (4" THICK) $________ $___________ ______________________ per Square Feet 11.01 30 L.F. REINFORCED CONCRETE PRECAST BOX CULVERT (4' x 2') $________ $___________ ______________________ per Linear Feet 11.07 3 CY SPECIAL HEADWALL, WINGS, AND APRON $________ $___________ ______________________ per Cubic Yard 13.15 340 L.F. STORM DRAIN PIPES, 15" (SIDE DRAIN) $________ $___________ ______________________ per Linear Feet 13.18 80 L.F. STORM DRAIN PIPES, 18" (SIDE DRAIN) $________ $___________ ______________________ per Linear Feet 13.24 380 L.F. STORM DRAIN PIPES, 24" (SIDE DRAIN) $________ $___________ ______________________ per Linear Feet 14.01 3035 S.Y. SOLID SODDING (BERMUDA) INCLUDES 4" OF TOPSOIL