1. REPOST: Water Well #7 Parts Installation: The objective of this project is to install specific components necessary for the efficient functioning of the water well system at Water Well #7 on campus. This scope focuses solely on the installation of parts, excluding the complete installation of the 6” T&C schedule 40 pipe. Currently, the water well is out of operation, necessitating prompt attention to restore its functionality. Scope of Work: The work will include, but is not limited to, the following tasks Pump: Installation of Franklin-Model # 8C3F-8" Encapsulated Moter-100HP/75 KW, 50/60 Hz, 380-415/ 460 VAC, 3-Phase Piping: Installation of 570' of 6" T&C Schedule 40 piping and fittings to connect the pump to the pressure tank and water distribution system. Electrical Components: Installation of wiring and electrical connections 575' of #1-gauge wire required for pump operation. Control Panel: Installation of the control panel to regulate the pump's operation. Valves and Fittings: Installation of necessary valves and fittings for proper operation of the water system.