• The proposal will include material, labor and equipment to construct a pour-and-play surface in two locations, one playground structure, and one swing set. Location 1 - Approximately 2,210 square feet of pour-in-place needed, Playground structure within a space of 48’ diameter, Swing set within a 12’ x 25’ space within the pour-in-place. • The proposal will include material, labor and equipment to construct a pour-and-play surface in two locations, one playground structure, and one swing set. Location 1 - Approximately 2,210 square feet of pour-in-place needed, Playground structure within a space of 48’ diameter, Swing set within a 12’ x 25’ space within the pour-in-place. • Please include three dimensional mock up pictures of playground structure in final presentation. • Contractor shall assume all responsibility for obtaining and verifying measurements, as well as verifying site conditions. • Contractor shall work with District staff to keep disruption of school grounds to a minimum. Trenches or ruts shall be backfilled and tamped by Contractor. • Underground Utility Locations: The Contractor is required to locate all utilities prior to construction. • Contractor is responsible for supplying and installing pour-and-play surface and one playground structure. • Project must be fully completed by July 25, 2025. - Contractor must work with the District contractor who is completing the sitework to schedule installation...