Provide all labor, materials, equipment, supplies, supervision, transportation, mileage, and all overhead burdens associated with the cost to perform the following: 3.3.2 Kitchen Hood Fire Suppression Systems Test and Inspections: 3.3.2.1 Inspections to be performed in six-month intervals. 3.3.2.2 Full inspection and testing of the system includes lubricating the system, checking the suppression system tank(s) condition; if testing or replacement is needed, check for proper operation of all system components including alarms and shutdowns; inspecting and testing all system components we be performed as required by the National Fire Protection Association (NFPA), Federal, State, and local laws and/or codes. 3.3.2.3 All systems require retagging upon completion of each inspection. 3.3.2.4 Replacement of fusible links will be performed on an as-needed basis at each location. The City will request a separate line item on the invoice to replace fusible links. 3.3.2.5 Report status of the fire alarm system prior to testing and after completion of testing; photos of the annunciator are desired. 3.3.2.6 Notify Central Monitoring prior to testing. Contractor will be responsible for any Fire Department fees incurred for false alarms if Central Monitoring is not notified...