• Site assessment and pipe condition evaluation. Conduct a detailed inspection using CCTV and other diagnostic tools to assess the condition of the CMP. • Cleaning and preparation of the pipes prior to rehabilitation. Set up measures to control water flow during rehabilitation if required. • Traffic control and public safety measures during the rehabilitation process. • Installation of a trenchless rehabilitation system (e.g., cured-in-place pipe (CIPP) lining, slip-lining, or other approved methods) • Disposal of waste and rehabilitation materials as required. • Perform a final inspection via CCTV to verify the integrity and functionality of the rehabilitated system. • Restore the site to its original condition, minimizing disruption to the surrounding homeowner property and environment. • Complete final reports documenting the rehabilitation process, including any issues encountered and resolutions.