The proposed improvements for the base bid include: A. Earth Excavation and Aggregate Base Course for a new section of Benjamin Elementary School Pathway near Ireland Grove Road. B. Hot-Mix Asphalt Surface Removal, 2” at the Lake Bloomington Boat Ramp and Lime Parking Lots, and Constitution Trail sections at Robinson Street and Hamilton Road. C. Placement of HMA SC IL-9.5, Mix C, N 50, 2” at Lake Bloomington Boat Ramp and Lime Parking Lots, Constitution Trail sections at Robinson Street and Hamilton Road, and Butler Parking Lot, and placement of HMA SC IL-9.5, Mix C, N 50, 3” at the Benjamin Elementary School Pathway near Ireland Grove Road. D. Sidewalk removal and PCC Ramp, 6” replacement at the intersections of Constitution Trail and Locust Street, Chestnut Street, and State Farm Park at Hamilton Road. E. Aggregate Base Repairs where necessary at Lake Bloomington Boat Ramp and Lime Parking Lots, and Butler Parking Lot. F. Paint Pavement Marking at Lake Bloomington Boat Ramp and Lime Parking Lots, and Butler Parking Lot.