Electrical Scope of Work 1 General Materials and Installation Install temporary power from temporary generator to shut down power for new installation. 2 Demo the existing automatic transfer switch and generator. 3 Install new 400A ATS in the same location as the existing ATS. 4 Re-work the existing conduits as necessary for installation of the new ATS. Install the new 130KW generator. The existing pad is to be utilized, modifications to the existing pad have been included. 5 Pull new cabling for 120V generator circuits. 6 Electrical permits and inspections Exclusions: 1. Weekend and/or after-hours work. 2. Provision of temporary generator. 3. Additions and/or modifications to the existing breakers and panels. 4. Payment and Performance bond. (If required please add 1%) 5. Prevailing wage rates. 6. Dumpster fees. 7. Utility Company fees. 8. Software and programming. 9. Cutting, patching, and/or painting of walls, floors, and ceilings