Task 1: Project Coordination and Planning Collaborate with the FCA Watershed Planning Team to integrate hydropower considerations into canal modernization plans. Develop a coordination plan to align hydropower design with watershed planning objectives. Task 2: Hydropower Site Assessment Conduct site visits and hydrological assessments, including flow rate measurements, pressure drops, and identification of energy recovery opportunities. Review the current canal infrastructure and assess the impact of piping upgrades on hydropower potential. Identify suitable sites for turbine installation. Task 3: Preliminary Engineering Design (50% Level) Design an in-conduit hydropower system, including turbine sizing, capacity analysis, and grid interconnection. Develop hydraulic models to assess the impact of canal piping on hydropower generation. Outline the electrical design, including grid connection and control systems. Task 4: Cost Estimation Provide a detailed cost estimate for hydropower system installation and integration. Task 5: Final Reporting and Documentation Submit a comprehensive 50%-level design report, including all analyses and findings. Provide design drawings for turbine locations, electrical interconnection, and system integration. Present findings to stakeholders.