• Courts will be rolled to compaction prior to cleaning. • Excess surface materials will be removed, scraped with the use of lutes, and disposed of off-site. Remove all vegetation, dead materials and leaves. • Courts will be scarified as required and leveled with a 12’straightedge. Baselines will be patched to improve heavy wear zone, including build-up at tennis nets. Also to include laser grade to fill in all ruts, holes, and depressions caused by fall, winter, & spring runoff. • A minimum of one ton of Har-Tru or equal clay product will be applied per court and spread evenly throughout the court using a mechanical spreader to allow even distribution. • Courts will be hydrated, brushed and rolled to proper compaction. • Courts will be surveyed, and new top grade lines will be laid out and installed. • Each court will require one-hundred (100) pounds of calcium chloride. • Courts will be groomed, and nets will be installed to the proper height. • A minimum of three (3) references required of tennis court clay installation.