The scope of work will generally include (without limitation) preconstruction services and evaluation of site investigations, budgeting, proposal of alternate systems, design review, constructability review, bidding, value engineering (if required), scheduling, setting of control, review of conformance drawings, purchase order management and construction administration in as many packages or scenarios as is expeditious or beneficial to RSA, including without limitation, for the following items: A- New cast in place concrete (with architectural precast veneer) parking facility to accommodate approximately 400 cars on two levels. B- New energy plant to provide chilled water and hot water for the Alabama Capital HVAC systems. C- Demolition of the existing Alabama State House D- Street and site reconfiguration associated with the project. E- Additional items of work may be encountered during the performance of the services described herein. 2 F- Note that the expectation is that the construction delivery will be in multiple packages to multiple prime contractors. G- The anticipated location is bounded by N. Union St., King St., S. Ripley St. and Washington Ave., Montgomery, Alabama, as shown in the image below. The final size and configuration of the project will be determined during the initial architectural phase of the project. H- The contract form will be an amended AIA CM not at Risk format modified to accommodate RSA’s purposes as a master contract, with individual project components as described above issued as individual work orders.