0. The foreman and project manager will need to meet with the superintendent for a “pre-start” job meeting. 11. This contractor is responsible for all existing site conditions in existence as of the bid due date. These conditions may not be identified on the drawings or in this scope of work. Examine prior to the bid. 12. All contractors are required to perform all layout required for their work. 13. No gasoline-powered equipment can be used at any time within buildings. All equipment you plan to use must be reviewed with the Superintendent for safety concerns. 14. SDS must be forwarded prior to starting work. No chemicals can be used at any time without properly reviewing them with WT first. 15. All contractors are required to perform any necessary dewatering in order to complete their work. 16. All subcontractors are responsible for daily cleanup of their debris to the jobsite dumpster. This means that no trash or excess construction materials can be left on site or in buildings at the end of the day. Failure to do so may result in backcharges. 17. The Construction Manager will supply a dumpster for the work, except as noted in the specific scopes of work. The contractor is responsible for placing debris in the dumpster. 18. Storage space will be limited. Materials and gang boxes cannot be in the way of other trades, traffic, fire lanes, access, etc. Review location and requirements with WT. Onsite storage trailer will not be allowed, provide off site storage and trucking as required. 19. Jobsite security and security of materials, equipment, tools, etc. is the responsibility of each contractor. 20. Contractors are required to coordinate with other trades and with Whiting-Turner. 21. Contractors are required to comply with all safety regulations as required by OSHA, State of Delaware, Appoquinimink School District, Whiting-Turner, and as noted in the specifications. Provide all safety devices necessary for your work. 22. All worker must have their company name and employee name on their hard hats. 23. All change order pricing must be accompanied by a labor and material breakdown and with subcontractor & vendor quotes. 24. Care must be taken to not mark or damage finished surfaces. Contractors will be backcharged or will need to pay for repairs to the work of others. Protect the owner’s property. 25. Roof protection must be provided by any contractor working on top of the completed roof systems. Minimum protection required is 2” rigid insulation and ¾” plywood. 26. All safety, barricades, floor opening protection, etc., installed by this contractor or by others is the responsibility of this contractor if moved or damaged by this contractor. 27. Provide all testing, guarantees, warranties, as-built drawings, O&M manuals, commissioning tests, close-out documentation, and start-up services necessary to put all work into first class operating condition per the contract documents including any final cleanup required. 28. As-built drawings must be maintained on the job-site and updated on a daily basis for review by Whiting-Turner. At contract completion, contractor must submit as-built drawings and O&M Manuals as required by specifications. 29. Where furnishing and installation of work is indicated by separate parties include: • Furnishing Party – delivery to jobsite including freight and taxes • Installing Party – receiving, unloading, inventory, storage, handling, and installation. 30. Core drilling, cutting & patching as required to perform work. Include restoration of surfaces to original condition if required. Cutting to be performed as to minimize patching. 31. Sealants, caulking, and firestopping integral with work. 32. Permit fees and licenses required for work, other than the building permit, shall be furnished by the contractor whose work requires such permits.