5. Contractor shall provide all equipment, labor, materials, supplies and tools necessary to upgrade electrical systems at the CHP Academy Kitchen to accommodate new equipment/appliances. The project will consist of the following: A. Contractor shall furnish and install two (2) 208volt 125amp three phase dedicated circuits for new Tilt Skillets in kitchen area. B. Contractor shall furnish and install 2” EMT conduit with #1 copper conductors from existing panel in electrical room to new Tilt Skillet locations. C. Contractor shall install two (2) new 600colt 200amp disconnects with 125amp fuses for Tilt Skillet locations. D. Contractor shall furnish and install 1 ½” seat tight flex conduit from disconnects to new Tilt Skillet locations. E. Contractor shall hardwire two (2) new Tilt Skillets. F. Contractor shall furnish and install two (2) new 3pole 125amp breakers into existing panel for Tilt Skillet circuits. G. Contractor shall test new 208volt 125amp three phase dedicated circuits. H. Contract shall remove all debris from jobsite daily. I. Contractor shall warranty work for a period of one (1) year after installation. 3. The services shall be provided during: Work shall be performed on weekends, evenings and/or holiday weekends. Contractor shall attend a pre-construction meeting with the CHP Facilities Coordinator and the on-site Contact, at which time the Contractor will provide a work schedule and any job-related submittals.