Specifications include, but are not limited to: This project consists of the abatement and complete demolition of the Electrical Engineering Building (42,403 sf), Manship Building (16,118 sf), and three smaller buildings in the immediate vicinity. In addition, utilities on the site are to be relocated to position them along the streets. The primary component of utility infrastructure is to include chilled water in accordance with the global campus chilled water plan and consider inclusion of domestic waste futures valves along with other utilities as needed. Additionally, the scope will include a new streetscape along the southern section of Fieldhouse Drive from South Stadium Drive to South Quad Boulevard. The streetscape scope is to include a twolane street, connecting at South Quad Boulevard, bike lanes, sidewalks, lighting, seating, etc.