1. The Contractor shall install silt fencing around entire area before demo starts. 2. The Contractor shall remove the power supply wires from the main panel box to the panel box located in the pool equipment room and from the panel box in the pool equipment room to the panel box in the kiddie pool equipment room. 3. The Contractor shall demolish the pool, equipment, walls, fencing and pool decking. If any hazard is found Contractor shall stop work and notify Facilities Management immediately. 4. The Contractor shall remove all non-concrete, metal and any other non-concrete material debris from State property and properly dispose of off-park within applicable regulations. Concrete shall be broken into 5-inch or less pieces for use by Contractor to subbase material for final slope. The Contractor shall demo the pool liner by cutting into sections or using equipment to remove and load for disposal. 5. The Contractor shall demo any metal found in pool demo site. This metal must be removed from State Park property and is up to Contractor for disposal off-park. No broken-up aggregate shall be used as backfill if it contains metal or re-bar.