A. Contractor shall provide a heavy-duty mechanical broom street sweeper, e.g., Elgin Eagle or equivalent to provide sweeping service to the entire parking lot area and roadway lanes. Contractor to provide a mobile or heavy-duty dustless power vacuum attachment capable of removing all debris and leaves from the paved parking area, fence line, etc. Hand blowing will be required in areas the sweeper will not reach. B. Contractor to provide service once every two (2) weeks. Contractor shall notify the CHP on-site contact the date and time of service two (2) days prior to the work being completed. C. Contractor to ensure that all debris is removed from the premises including the refuse and debris that may accumulate around the building, in the parking lot, and roadway lanes. This shall include removal of debris and leaves in corners, behind wheel stops, along all fence lines, and recessed areas which are accessible by the mobile unit. D. All services shall be performed by trained competent workers. E. Any work found unsatisfactory shall be redone before the next scheduled service at no additional cost to the State. In the event of equipment failure, Contractor must respond with back-up personnel and power sweeper within two (2) working days at no additional charge to the CHP. Contractor must respond to all recalls within 24 hours after notification from the CHP on-site contact or the CHP Facilities Coordinator. After two (2) recalls for unsatisfactory work, the State reserves the right to terminate the contract. F. During inclement weather, Contractor is to schedule an appointment with CHP on-site contact for make-up service. G. Contractor shall take all necessary precautions to protect service location. Any damage caused by Contractor to State equipment, materials, or other property shall be repaired or replaced by Contractor to the satisfaction of the state at no cost to the state. The state may, at its option, repair any damage and deduct from contractor the cost thereof. H. All quotations for additional services not covered under this Agreement are to be provided to the state at no cost by Contractor. I. The prime Contractor must provide a majority of the services under this Agreement. Material vendors are not included.