• A separated and/or on-road bicycle facility along a portion of 300 W in South Salt Lake City, including surveying, drafting of concept and construction plans, and providing assistance during bidding and construction. • The connection of Parley’s Trail from State Street to 300 W, including surveying, drafting of concept and construction plans, and providing assistance during bidding and construction. • The redesign of the cross section of Central Pointe Place between State Street and Main Street, including surveying, drafting of concept and construction plans, and providing assistance during bidding and construction. • Design of a multimodal facility which will connect Parley’s Trail to a planned future East entrance to the Central Pointe Station located at the West end of W Utopia Ave.