Construct Silurian Well 16 including all materials, labor and equipment necessary to construct well including mobilization, Well Water Pollution Prevention Plan, 23" drill hole, 17" drill hole, 11" drill hole, installing 18" and 12" steel casing pipe, cement grouting, bentonite sealing, well development and test pumping; acidizing, disinfection, water quality testing; excavation, backfill, embankment, grading, sitework and driveway; painting; electrical work including conduit, cables, power wiring, switches, fixtures and controls; controls integration; generator, control building, and transformer pad; meter manhole; pitless unit, submersible well pump and motor, discharge column piping, miscellaneous equipment; piping and appurtenances; 4,664 LF of 12" water main directional bored in place, 308 LF of 8" diameter water main in open cut; 180 LF of 12" diameter restrained joint DI water main inside casing pipe bored in place under railroad; valves; hydrants; connections to existing water system; seeding and erosion control; and miscellaneous associated work, including cleanup.