The work will take place at four separate locations along Mill Creek. All locations will be bid on by the Contractor as a single project. The OWNER may elect to award work at all locations or may award only specific locations. The work generally includes the following items: mobilization, demobilization, bonds, construction surveying, utility location, excavation and grading, removal and disposal of sediment, protection of existing facilities and nearby properties, protection of existing cultural resources, accessing the project sites by way of existing easements, temporary diversion of the stream, installation of riprap stream protection, re-vegetation, placement of fill and other work needed to complete the work as included in the specification and drawings. A general description for each is as follows: Dream Drive Construct a gabion wall along the stream bank. Rotary Park Construct a gabion wall along the stream banks. 400 East Construct a gabion wall on the north side of the stream. Remove deposited sediments, garbage, and other debris. Check Dam Preserve in place existing CCC era check dam. Construct a new check dam upstream of the existing site.