Contractor shall: 1. Provide all supplies, materials, and equipment to include, but not limited to: soap, deodorizers, bleach, disinfectant, polish, wax, floor sealer, waxing pads, low-high 3 speed buffer machines, window cleaner, carpet cleaner, stain remover, broom, duster, mop, mop bucket, and vacuum cleaner. 2. Provide all consumable items for restrooms. These items shall include liquid hand soap, paper towels, paper seat covers, two-ply toilet tissue, and waste basket liners. 3. Respond within 24 hours to all concerns of the State. 4. Be responsible for completion of a daily checkoff list (Attachment1) as services are provided. At the end of the week, the service crew shall initial and date the list verifying that all services were provided in a professional manner. Location B - Contractor shall: 1. Service one restroom trailer (12’x52’) containing six (6) toilets, two (2) urinals, two (2) shower stalls, and six (6) sinks. 2. Provide supplies, materials, equipment to include: rotary floor machine, wet/dry vacuum, drying fans, stripping pads, polish pads, floor stripper solution, floor sealer, floor finish, baseboard stripper, masking tape, glass cleaner, toilet bowl cleaner, floor cleaner, disinfectant cleaner, stain removers, upright brooms, dust pan, extendable duster, wet mop handle, mop heads, mop bucket with wringer, maid caddy, spray bottles, hand scrub brushes, scraping tools, cleaning towels, appropriate personal protective equipment (PPE), and safety data sheets (SDS) for all products containing chemicals, chemical compounds, or chemical mixtures. 3. Provide CDFA with a copy of the safety data sheets (SDS) for all contractor-supplied products to include, but not limited to: floor stripper solution, floor sealer, floor finish, baseboard stripper, glass cleaner, toilet bowl cleaner, floor cleaner, disinfectant cleaner, and stain removers. 4. Notify the State Agency contact to schedule monthly floor stripping and waxing. 5. Respond within 24 hours to all concerns of the State...