• 700' of 6" Drilled Domestic Well • 525' of 6" 13lb casing • Cement Grout & Drive Shoe • Mo. DNR Well Certification • Gould 65GS100 Pump (60gpm @ 500tdh) Construction Type SS, 4" OD • 10hp 460v 3ph submersible pump Gould Motor • 15hp 208v x 460v 3ph Phase Tech VFD (Note: Contractor to convert from 120/208 volt 3 phase to 460v) • 600' of 2" Sch120 PVC with Stainless Steel Couplings • 600' of 10/3 w/g Flat Jacketed Regency Wire • 3 – 2" SS Flomatic Check Valves • 6" x 3' x 2" Baker Pitless Adapter • 8' x 8' Insulated Pump House with 3' Door & Concrete Footing & Floor located adjacent to well with all equipment needed for a contractor installed complete and functional pressurized system with a minimum flow of 50 gal per minute • 300' of 100amp Electrical Service & Well House Heater (150' outside installed in PVC electrical conduit and 150' inside of cold storage installed in EMT conduit to existing panel for a complete and operational system. All voltages and load requirements shall be confirmed by contractor and all electric work shall be installed in strict compliance with the latest edition of National Electric Code.) • 200' of 2" HDPE Water Service Line shut off valve at pump house & 2" Kuperle Flush Hydrant • New 5' #77 Kupferle MainGaurd flush hydrant to replace existing hydrant and abandon in place/cap existing water line leading to the brine system. • 2" Line stubbed out and shut off installed on north side of pump house for future expansion to maintenance building for future service. • Labor to install complete and functional system. Note: • General Contractor shall self-perform a minimum of 10% of the project. • When bidding General Contractor shall supply a subcontractor list for any portion of the project over 10% at time of bidding. • General Contractor shall make preapproved site visit for its bid to be accepted. • The Contractor shall provide proof of OSHA 10 for all employees of the Contractor or subcontractor, along with a State or Federally approved photo ID for each employee before any work can be conducted on MoDOT property.