The pavement rehabilitation work consists of milling and filling two travel lanes and the median and outside shoulders for both northbound and southbound approaches. The limit of work will extend 150 feet beyond the project end mile marker in the northbound lanes. Excess material in the median will be removed and catch basins shall be cleaned to restore proper drainage. Noted catch basin tops will be replaced and concrete aprons will be installed around the basins where required. Guardrail height will be adjusted as necessary, with damaged sections of guardrail being replaced where it is needed. The splash pad at the outlet of the 48” culvert located on the east side of the turnpike at Station 2717+45 shall be supported by grout bags underneath the hanging end. Void filled riprap shall be used to restore the grade of the stream adjacent to the outfall. Pavement markings, maintenance of traffic and all other work incidental thereto will be completed in accordance with the Plans and Specifications.