Req. approx. 1,675 ft2 temp. signs; 2 ea seq. arr. signs; 3 ea PCMS; 2 ea rdr. spd. trlr.; 1,300 hrs flag.; 5 ea flag. sta. light.; 120 hr pilot cars; 2 ea AFAD; 174,457 ft temp. striping; 1 ea TMA; const. & rem. temp. rd. bd. & surf.; 14 ea temp. wtr. mgmt. fac.; 2,250 ft sed. barr.; turb. mntr.; 243 ton contam. soil disp.; 178 ft rem. asb. mtl.; const. surv. wrk.; 956 ft asph. pvmt. sawcut.; 511 yd3 exc.; 9 yd2 geot.; 401 yd3 tr. found.; 194 ft CIPP liner; 1,306 ft vid. inspect.; 1,591 ft pipe; 823 ft2 pav. culv. end sl.; 5 ea conc. M.H.; 11 ea conc. inlets; 1,002 yd2 tr. resurf.; 2,551 yd2 br. dk. CPPR; 121 yd2 cl. 2 prep.; 12,514 ft2 poly. memb.; 0.7 yd3 elas. conc. nos. rep. mtl.; 63 ft rep. elas. conc. nos.; 427 ft pour. seals; 500 yd2 br. appr. slab CPPR; 6,811 ft2 roll. wtrpf. memb.; 5,420 yd2 MPCO rem.; 5,420 yd2 furn. MPCO mtl.; 5,420 yd2 const. MPCO; 180 ft prot. fence; 364 ft elas. conc. nos.; 220,497 yd2 CPPR; 901 ton aggr. base; 4,000 ton aggr. shldr.; 69 ton emuls. asph. tk. ct.; 40,935 ton ACP (2,457 ton PG 64-22 asph.); 1,500 yd2 ACP rep.; 35 ea asph. appr.; 20,231 ft gd. rl.; 100 ft mt. med. barr.; 897 ea delin.; 89 ea culv. drain. mrkr.; 5 ea br. ID mrkr.; 76 ea surf. mt. tub. mrkr.; 2.2 miles rumb. strips; 165,000 ft thermo. striping; 132 fbm wd. sign post; 32 ft2 signs; 1.25 acre seeding.