1.01 These specifications have been written to purchase, and have installed, a replacement Return Activated Sludge (RAS) Pump & Waste Activated Sludge (WAS) Pump (UNITS) for our North Cary Water Reclamation Facility, by a reputable vendor (CONTRACTOR). The facility currently has six (6) RAS Fairbanks Morse and three (3) WAS Fairbanks Morse pumps available for use that are nearing the end of their useful life. A. Cary will be replacing all nine (9) pumps over time but want to replace one of each (1) UNITS immediately. 1. Pricing submitted for consideration must be held firm for twelve (12) months. 2. Cary’s current plan is to start up additional purchases at least 30 days apart. B. The CONTRACTOR shall provide a pump(s) as specified herein. Cary will procure and install any required adaptor(s) to mate the pump(s) to the existing slide rail system.