A. Possession of space required by May 1, 2025 or as soon thereafter as possible. B. The initial term of the lease will be for 5 years with renewal options desired. C. At the option of the State Property Office, proposer may be required to own the proposed site within thirty (30) days of Council of State approval, or a date approved by State Property Office, or the proposal may be disqualified. D. Construction shall begin within six (6) months from Council of State approval unless otherwise authorized by the State Property Office. VI. ELECTRICAL, TELEPHONE, MAIN SERVICE OUTLETS A. A minimum of 42 120 Volt duplex electrical outlets are required. Unless otherwise approved by the State: 1. All private offices shall have a minimum of (3) duplex receptacles. 2. Electrical service shall support a minimum of (3) duplex receptacles per partial height modular workstation or per person in an open office environment. Service shall be provided by lessor via overhead or under floor distribution system utilizing power poles or other suitable facilities to accommodate the electrical needs of the agency. All connections to the building electrical service shall be by the Lessor. 3. Each Kitchenette or Break Area shall be provided with sufficient electrical circuitry to accommodate a refrigerator, microwave oven, coffee maker and vending machine. Separate circuits are required for this area. 4. (1) Duplex receptacle shall be provided for every 50 linear feet of corridor. 5. (1) Dedicated 20-amp 110-volt circuit with isolated grounds are required in the LAN room. Outlets to be installed 36” from the floor. If more than one LAN room, the requirements above are required for each LAN room...