Major Items Include (approximate quantities listed, all projects): SETTLEMENT MONITORING 1 LUMP SUM MOBILIZATION 1 LS REMOVE BITUMINOUS PAVEMENT 13,317 SQ YD EXCAVATION – COMMON 45,488 CU YD COMMON EMBANKMENT (CV) 93,774 CU YD AGGREGATE SURFACING (CV) CLASS 2 2,192 CU YD AGGREGATE BASE CLASS (CV) CLASS 5 11,597 CU YD FULL DEPTH RECLAMATION 23,853 SQ YD TYPE SP 9.5 WEARING COURSE MIX (3,C) 11,682 TON TYPE SP 12.5 NON WEAR COURSE MIX (3,B) 5,238 TON 6” PE PIPE DRAIN 2,866 LIN FT 6” PERF PE PIPE DRAIN 6,611 LIN FT LIFT STATION 1 EACH STANDARD VALVE MANHOLE 1 EACH 4” PVC FORCE MAIN 1,950 LIN FT CONST DRAINAGE STRUCTURE DESIGN SD-48 46.6 LIN FT CONSTRUCT LIFT STATION 1 LUMP SUM INSTALL MANHOLE 2 EACH 3” BITUMINOUS WALK 40,788 SQ FT SERVICE CABINET 1 EACH TRAFFIC CONTROL 1 LUMP SUM