1. Verify address and size of property, check the map, block and parcel numbers for size and shape of the parcel, review and inspect site prior to bidding. 2. Comply with all applicable laws, ordinances and codes of the federal, state and local governments and shall commit no trespass on any public or private property in performing any of the work as outlined. Obtain all required City, County, State, Federal and/or permits, clearances, inspections and licenses prior to work. 3. Provide the City a copy of permit prior to any work being performed. 4. The debris shall be hauled to an approved landfill as required by local codes and law. All dump fees/receipts for this demolition project shall be turned into the City along with invoices. 5. All work shall encompass all of the property and to the edge of the street and/or streets. 6. Remove all vegetation, downed trees, rubbish and/or debris from the property. 7. Neatly trim all mature trees, all limbs shall be cut, trimmed or removed so the lowest limb hanging shall be no less than 12 feet above the ground. All trees which measure up to and including 36 inches around at any point from ground level up to 48 inches above ground shall be removed. All trees removed, if cut shall be 6 inches below the finished ground level. 8. Completely demolish and remove the entire structure including all related and unrelated, attached and detached, surface and subsurface structural systems, materials, fixtures and utility systems, all pavement, concrete slabs, piers, foundations, poles, posts and all other improvements including all related and unrelated as described, all stumps, specified trees, shrubs and vegetation. Dust control shall be provided by contractor. 9. Completely remove all tanks, tires, septic systems, glass, metal, wood and all other debris. 10. The bid should include all necessary fill dirt to achieve even ground and positive grade. The lot shall have erosion control used where and as needed. The lot shall be seeded and straw over the seed to protect from erosion and burning. The lot shall be construction ready prior to invoicing.