THARALDSON FIELD – CONCRETE WORK 17TH AVE N / 18TH ST N DEMOLITION NOTES: 1. CONSTRUCTION SHALL COMPLY WITH CITY OF FARGO AND NDSU STANDARD SPECIFICATIONS FOR CONSTRUCTION. 2. CONSTRUCTION STAGING LOCATION SHALL BE COORDINATED WITH AND APPROVED BY OWNER. 3. ALL EXISTING PAVEMENT, UTILITIES, BURIED DEBRIS, RUBBLE AND/OR STRUCTURES/FOUNDATIONS ENCOUNTERED WITHIN AREAS OF DISTURBANCE SHALL BE COMPLETELY REMOVED PRIOR TO OR DURING EARTHWORK OPERATIONS. WASTED MATERIAL SHALL NOT BE BURIED ONSITE WITHOUT THE PRIOR APPROVAL OF THE OWNER. 4. IF REQUIRED, THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE PERMITS AND AUTHORIZATION TO DISCHARGE FROM DEWATERING ACTIVITIES. 5. CONTRACTOR TO COORDINATE WITH UNDERGROUND UTILITY OWNERS PRIOR TO AND DURING CONSTRUCTION TO AVOID CONFLICTS. 6. CONTRACTOR SHALL FIELD VERIFY EXISTING CATCH BASINS, INVERT ELEVATIONS, AND PIPE SIZES. 7. CONTRACTOR SHALL ADJUST ALL UTILITY STRUCTURES TO MATCH FINISHED GRADE. CONTRACTOR SHALL SALVAGE AND REUSE EXISTING CASTINGS AND PROVIDE RINGS AND OTHER MATERIAL AS NECESSARY TO BRING CASTINGS TO GRADE. 8. PROTECT ALL EXISTING ITEMS NOT MARKED FOR REMOVAL. 9. ALL TREES AND PLANTS NOT MARKED FOR REMOVAL SHALL BE PROTECTED FROM DAMAGE BY CONSTRUCTION SUITABLE BARRIERS OR FENCES AT, OR NEAR, THE DRIP LINES OF THE TREES AND PLANTS. VEHICLES, EQUIPMENT, MATERIALS, AND DEBRIS SHALL NOT BE PLACED OR PARKED IN THESE AREAS OR UNDER TREES TO REMAIN. 10. CONTRACTOR SHALL PROVIDE PEDESTRIAN AND MOTOR VEHICLE TRAFFIC CONTROL DEVICES AS NECESSARY.