The successful proposer (hereinafter referred to as “Contractor”) shall furnish all permits, materials, equipment, and labor necessary to perform all tasks described in the Scope of Work, including: removing and disposing of existing media; performing a visual inspection of the tank and repairing defective areas (including spot and patch welding) as needed; preparing and painting interior and exterior surfaces; pressure testing; replacement of brine inlet valve and electronic actuator; and, installing new gravel and media in a total of one (1) steel tank softener vessel. Work will be performed at ONWASA’s Dixon Water Treatment Plant, 6661 Wilmington Hwy, Holly Ridge, NC 28445. Work is to begin within seven (7) calendar days from the receipt of a Notice to Proceed, and all work on the project shall be completed and the tank ready for service within 30 calendar days from that date.