Scope of Work: Materials - the contractor will provide the following materials: • A step-by-step written guideline to be followed when preparing the greens using the No Till Renovation Process. • Glyphosate mixture & application apparatus for use as part of a procedure for eradication of the existing turf. • Week-by-week written guidelines to be followed during the grow-in process • A gasoline-powered edger (Atom™ Edger) or equivalent will be provided for use in preparing the greens, and to keep for use in maintaining precise definition between the collar and the putting surface. Services - provide the following services as a part of this proposal: • Assessment Site Visit – contractor personnel will visit before beginning the job to identify any areas of concern that require attention during the conversion process: o Sunlight - Each green will be evaluated for adequate sunlight and any problematic trees will be identified. o Surface Drainage - The contours of each green will be evaluated for adequate sheet-flow surface drainage and remedies will be prescribed for any areas which need to be addressed. o Infrastructure Assessment – contractor personnel will identify any concerns with the irrigation system, maintenance equipment, or labor availability that would hinder the ability to produce top-quality putting surfaces using Champion Ultradwarf Bermudagrass or equivalent cultivar. • Soil testing – the contractor will take soil tests before the renovation process to determine appropriate soil amendments to be made during the conversion • Amendment recommendations – the contractor will make soil amendment and pre-plant fertilizer recommendations to be applied during the preparation of the greens