Remove old and install new Hard surface Corian counter tops with under panels and, new hardware Men and Women’s. (ADA Standards) New stainless framed mirrors Men and Women’s Remove existing fixture Install new LED light fixtures Men and Women’s Remove and install new Sinks, Commodes, Urinal’s and new hardware in Men’s, Women’s restrooms. Remove and install new Bobrick B-2111 40oz stainless steel soap dispensers. Men’s and Women’s restrooms Remove and install new San Jamar twin 9” jumbo toilet tissue dispensers (Color Black Pearl) Remove and install all new Thin Air Hand Dryers 136TAABSA (Color White) Remove and install all new Toilet Partitions and hardware (Color to be determined Epoxy Floors and extends up the walls 5 feet. Upper section of walls and ceiling to be painted. (Colors to be determined) Paint louvers on both sides of building (Match exiting Paint) Replace return air vents with new. Replace all entrance doors with new doors, pull handles and kick plates. (match existing doors)