This project consists of, but is not limited to, the removal and installation of one sanitary manhole and the abandonment of sanitary sewer main, the removal of sanitary sewer main, and the installation of 10” sanitary sewer main, along with replacement of two (2) Manhole lids and rings. The installation of new sanitary sewer main includes, but is not limited to, the reconnection of existing sanitary sewer services, the installation of sanitary sewer service pipe, the, paving of all removed asphalt roadway, placement of asphalt on roadway, and the operation of a temporary bypass pump to allow connection of the new sanitary system to the existing without disruption of sewer service. All work shall be completed as shown on the construction plans and as described in these specifications.