Project Category Code: Paving (Highway, Road or Street), Street/Road Asphalt Resurfacing and Milling, Culverts, Waterways, Stormwater Channels, Erosion Control - Temporary, Paving (Asphalt or Concrete). The project includes rehabilitation of approximately 1800 LF of Dahmen Drive with a bid alternate including an additional 3115 LF of roadway rehabilitation on Clover Hill Drive. Roadway rehabilitation work includes the addition of gravel base over the existing pavement, pulverization of added gravel base and existing roadway, regrading of pulverized material, proof roll of roadway base and any required undercut, placement of new asphaltic pavement and gravel shoulders. Project work also includes driveway grading, select culvert replacements, ditching and associated erosion control and restoration for ditching and culverts as indicated in the Construction Plans and Documents. The Work will be substantially completed on or before August 30th, 2025 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 13th, 2025.