3.2 INSTALLATION A. Follow manufacturer's instructions for all installation steps. B. Provide a complete installation per Contract Documents. C. Ensure sensor locations provide complete coverage of associated areas and are placed to avoid conflicts with equipment and appurtenances of other trades. D. Ensure daylight sensor placement minimizes sensor view of electric light sources. Locate ceiling-mounted and luminaire-mounted daylight sensors to avoid direct view of luminaires. E. Identify system components in accordance with Section 26 05 53 "Electrical Identification." 3.3 FIELD QUALITY CONTROL A. Refer to Section 01 40 00 "Quality Requirements," for additional requirements. B. Manufacturer's Full-Scope Start-Up Service is required. C. Correct defective work, adjust for proper operation, and retest until entire system complies with Contract Documents. D. Provide a complete installation per Contract Documents. 3.4 CLEANING A. Clean exposed surfaces to remove dirt, paint, or other foreign material and restore to match original factory finish. 3.5 CLOSEOUT ACTIVITIES A. Refer to Section 01 70 00 "Execution and Closeout Requirements" for closeout submittals. B. Demonstration: 1. Demonstrate proper operation of lighting control devices to Owner and correct deficiencies or make adjustments as directed. 2. On-Site Performance-Verification Walkthrough: Provide on-site demonstration of system functionality to commissioning agent. C. Training: 1. Include services of manufacturer's certified service representative to perform on-site training of Owner's personnel on operation, adjustment, and maintenance of lighting control system as part of on-site start-up services.