The selected firm will be required to perform the following tasks: 1. Site Assessments a. Evaluate the current energy consumption of county facilities. b. Conduct site visits to assess the sites for solar installation and type, such as roof, ground, or canopy. c. Assess the existing building electrical systems to identify potential power system modifications required to support PV connections. d. Identify other infrastructure and/or structural improvements required for solar installation. e. Identify any potential obstacles or limitations; include programming or mission-execution challenges posed to the property, such as physical constraints, age, and solar readiness. 2. Feasibility Analysis a. Analyze each site's solar potential using solar mapping tools. The feasibility report should include the system's recommended size (KW of output), the estimated installation cost, the estimated maintenance budget, and a return-on-investment analysis. Recommendations should be based on correctly sizing the system based on the facility’s historical energy demand...