Bingham Facility 2 supports the Division of Comparative Medicine and is located in Orange County. The building is currently served by two 100% outside air DX cooling/propane gas heating units located on the building roof. The units were designed to condition 8000 CFM to maintain an indoor temperature to 70-74F. This project will replace the current systems with a system to be able to maintain required conditions. The new system will include design and installation of a new air-cooled chiller and a new propane hot water boiler as part of this project. The design team shall: • Assist in coordination of University stakeholders, such as, the Department of Facilities Planning + Design, Construction Management, Facilities Engineering, Energy Services, Information Technology Services, and other University support services. • Participate in land entitlement process with Town of Chapel Hill • Prepare designs including Cost Analysis of multiple options. All contract documents shall be in compliance with provisions regarding the NC Building Codes. • Respond to comments as part of the State Construction Office review process for Capital Planning Projects. • Prepare Cost Estimates, Project Schedules, Phasing Plans (as may be necessary), and Concept Renderings for the project.