OVERVIEW OF THE WORK: 1. NDOT plans to expand US-275 and N-92 using a 2+2 strategy which involves utilizing the existing two lanes and adding two new lanes adjacent to the existing lanes. The resulting roadway cross section will be a 4-lane divided highway. Where practical, the existing lanes will remain on alignment, and it is proposed to maintain the existing profile. It is assumed that the existing lanes will be resurfaced upon completion of the new lanes. 2. There are eight (8) existing bridge structures and seven (7) bridge-size box culverts that will be considered for replacement, rehabilitation, repair, or extension with twin structures built adjacent to the existing bridge structures to accommodate the new 2+2 facility. 3. New right-of-way (ROW), utility rehabilitation, extensive grading, and culvert work will be required for the expansion of US-275 and N-92.