A. Replace existing glass with new level 3 ballistic glass panels on top of existing counter in matching aluminum framing in lobby. B. Ballistic glass to be lightly tinted. Awarded vendor to provide glass tinting samples after award of contract for review and approval by the CHP Facilities Coordinator. C. Furnish all new framing materials to support the glass panels as necessary. D. Paint and finish the front face around windows, if needed. E. Replace door/sidelight/transom assembly with level 3 ballistic framed partition with an 8” gap from ceiling and secured to structure above. Install new level 3 bullet resistant door and frame. F. Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment for staff. All debris, trash and packaging is to be disposed of off-site on a daily basis. G. All materials to be warrantied as per the manufacturer’s warranty. Contractor to provide a one (1) year warranty on their workmanship.