Replace current power rail channel isolation enclosure (Figure 1) and move the internal equipment onto a new panel in the new enclosure (Figure 2). Reinstall current switches and accompanying equipment into the enclosures. Replace all required mounting hardware/supports in the process. Perform a test operation of the switches and lights (red indication is power up and switch closed, and green is power down and switch open). Deliverables: From the Scope of Work the below list is for the above-mentioned stations. Removal and demo of current isolation enclosures (Figure 1). Contractor to provide secondary support structure and hardware for the new enclosures mounting. o Unistrut o Brackets o All accompanying hardware or methods (example: welding) Reinstallation of switches and wiring of new enclosures and lights o 24 stainless steel enclosures o 24 red and green Allen Bradley lights o 24 panels for the stainless-steel enclosures Verification testing on original equipment inside the new enclosures. o Verify phasing of all power rail connections. o Label all phasing as A (black), B (red), and C (blue). o Contractor to perform functionality check of the enclosures...