pe Includes: Remove old asphalt by grinding, excavating, or other means as necessary and dispose in accordance with applicable codes and regulations. Contractor is responsible for obtaining locates for underground utilities. Dig out tree roots and back fill with base/sub base materials as needed. Provide and install new asphalt paving, concrete parking bumpers, and striping for the area specified in this document. Striping to match existing. See Exhibits contained in this request for additional information on asphalt specifications in Exhibit 1 Project must be completed before June 30th 2025. Proposal should include pricing the following conditions: o Base Bid – Pricing for normal working hours o Add alt #1 – Blue areas shown as “ALT #1” for normal working hours o Add alt #2 – Afterhours/weekend work for both base bid areas and “ALT #1” areas o Unit costs for subgrade repair. Should issues be discovered, contractor to work with Owner on change amount. Project area depicted below. Total area is approximately 80,000 square feet. Contractor to verify exact square footage