The Town of Norwich, Vermont, herein after referred to as the Municipality, is soliciting Construction Inspection Services for the above referenced project. Construction includes, but is not limited to, the following: Culvert removal and replacement, excavation, backfill, road construction, and guardrail installation. This work will occur in three separate locations throughout the Town of Norwich by a single contractor: 1) Illsley Road, 300 ft south of the intersection with Podunk Road, includesremoval of a CMP and replacement with an aluminized steel pipe arch, 2) Kate Wallace Road, 300 ft north of the intersection with Tucker Hill Road, includes removal of a CMP and replacement with a precast concrete culvert, and 3) Norford Lake Road, 100ft east of the intersection with New Boston Road, includes removal of a CMP and replacement with a precast concrete culvert.