The design of approximately 2,780 linear feet (0.5 miles) of new sidewalks to create connectivity, safety, and ADA compliance along a portion of Highway 2 in Evergreen. The project will construct sidewalks between the intersections of East Evergreen and Poplar Street on the east side of Highway 2 and from Meadowlark Street to Terry Street on the west side. The project was selected as part of the 2023 round of TA funding. The consultant will be required to provide comprehensive design services necessary for the project, including (but not limited to) sidewalk design, survey, hydraulics analysis and design, right-ofway verification and potential design, acquisition, etc. if needed, utility coordination, and environmental analysis and documentation.