1. Remove damaged wood frame structure. 2. Field Verify all site conditions 3. Remove CMY/Brick Piers and or concrete slab(s) field verify 4. Remove all tires, trash, roof remnants, garbage, ETC. off site 5. Aluminum fence shall remain 6. Remove all vines, bushes, shrubs along the entire perimeter and cut trees with a caliper of 8” or less 4” above grade within the property lines/fence line 7. Clear entire lot, remove all trash/garbage, cut all grass/weeds up to property lines 8. Contractor shall fill all voids of disturbed areas 9. Contractor shall provide, install and maintain all temporary erosion control measures 10. Cap all sewage lines at the Curb: notify municipal enforcement department when sewage line is capped 11. Before and after photos are required with pay request