This Project consists of generally includes furnishing and installing 3910 SF of head walk floats, 5500 SF of main walk floats, 928 SF Tee float, 5 ea. 6x48 fingers, 12 ea. 6x42 fingers, and 8 ea. 4x4 finger floats. Additionally, the WORK includes furnishing and installing all required 12.75” diameter and 16” diameter steel pilings, refurbishing and installing an aluminum gangway, furnishing and installing a new 840 SF approach dock, furnishing and installing all-season potable water system and fire suppression system, furnishing and installing safety equipment, and furnishing and installing a GFCI protected electrical system and LED lighting system. The project also includes furnishing and installing pile anodes within the Aurora Harbor basin as an additive alternate.