Replace old 3” copper pipe on the maintenance hall that is leaking from the boiler room, across the hall and back over to new existing piping to eliminate all leaks that currently exist. Work will be completed after hours and in one night. Materials/Parts: 3” copper pipe 100 ft; 2 ½” copper pipe 20 ft; 2 ½’ propress ball valve; 3” propress ball valve; 3” propress tee; 3”x 2” propress reducer; 2” x 1” propress reducer; 3” propress 90; 3” propress coupling; 3” insulation 100 ft Labor Description: Cut off water and remove 100 ft of 3” copper pipe that is leaking from boiler room, across the hall and back over to new existing piping BN-Pipe Replacement Parts Replace old 3” copper pipe on the maintenance hall that is leaking from the boiler room, across the hall and back over to new existing piping to eliminate all leaks that currently exist. Work will be completed after hours and in one night. Site visit is mandatory. Materials/Parts: 3” copper pipe 100 ft 2 ½” copper pipe 20 ft 2 ½’ propress ball valve 3” propress ball valve 3” propress tee 3”x 2” propress reducer 2” x 1” propress reducer 3” propress 90 3” propress coupling 3” insulation 100 ft Labor Description: Cut off water and remove 100 ft of 3” copper pipe that is leaking from boiler room, across the hall and back over to new existing piping.