• Sand to bare wood the existing west gym floor at the High School. • All polyurethanes, paints are to be MFMA approved, VOC compliant products. • Apply TWO seal coats, game lines, lettering, and all paint as recommended by Southington Public Schools on the floor. • New court lines added to the existing to account for FOUR new basketball hoops being installed this Spring. • Apply THREE finish coats of oil-based gym finish • Color options should be made available to choose from. Special blended colors may be an additional cost and should be noted on the bid response page. • An adequate electrical breaker, for sanding equipment may be supplied by the owner. • A vector file of any and all artwork logo, and script shall be provided by the flooring contractor for graphics people to do the mask templates needed. • School dumpster shall be made available for sanding dust, waste, and trash disposal. • Standard MFMA floor sanding and sealing guidelines shall be adhered to for the entire process. • Repairs and occasional flooring replacement from old water damage, as necessary, may be added to the bid cost.